Model Number: ZM, A4-II
Brand Name: LD
Key Specifications/Special Features:
Prefabricated house camp project in TanzaniaHouse model: ZM, A4-IIApplication fields: industrial application (construction camp/mining camp)Type: sales+ installation supervisorBuilding area: 10297m2Requirement:1. Design as 7 different camps2. Need elevated flooring due to wet & humid condition3. Office/accommodation/canteenProject details:
1. The end users were CPP no.1 construction and no.6 construction company
2. This was the temporary camp for petroleum project
3. The installation was arranged by client
Highlights:
1. Reasonable camping layout
2. First lot’s delivery time was urgent, but after the production it was postponed by Tanzanian local political issues, after 2 months, it started again
3. Client was very satisfied with the supervision of our engineer on the job site
Summary:
1. Fast reaction for all the 7 camps
2. To save cost for client, we offered the best options both on house cost and container loading, as well as installation
1. The end users were CPP no.1 construction and no.6 construction company
2. This was the temporary camp for petroleum project
3. The installation was arranged by client
Highlights:
1. Reasonable camping layout
2. First lot’s delivery time was urgent, but after the production it was postponed by Tanzanian local political issues, after 2 months, it started again
3. Client was very satisfied with the supervision of our engineer on the job site
Summary:
1. Fast reaction for all the 7 camps
2. To save cost for client, we offered the best options both on house cost and container loading, as well as installation
Prefabricated house camp project in Tanzania House model: ZM, A4-II Application fields: industrial application (construction camp/mining camp) Type: sales+ installation supervisor Building area: 10297m2 Requirement: 1. Design as 7 different camps 2. Need elevated flooring due to wet & humid condition 3. Office/accommodation/canteen Project details: 1. The end users were CPP no.1 construction and no.6 construction company 2. This was the temporary camp for petroleum project 3. The installation was arranged by client Highlights: 1. Reasonable camping layout 2. First lot’s delivery time was urgent, but after the production it was postponed by Tanzanian local political issues, after 2 months, it started again 3. Client was very satisfied with the supervision of our engineer on the job site Summary: 1. Fast reaction for all the 7 camps 2. To save cost for client, we offered the best options both on house cost and container loading, as well as installation |
Shipping Information:
- FOB Port: China (Mainland)
- Lead Time: 20 - 40 days
Main Export Markets:
- Eastern Europe
- North America
- Mid East/Africa
- Central/South America
- Asia
- Western Europe
- Australasia